Expedite Engineering Services were engaged by the client to assist with both the temporary and permanent works associated with the demolition and rebuild of a former fire damaged hotel into 3 apartment blocks.

The complexity in the project arose from the steep slope on the site and agreed planning levels (prior to our input) which resulted in the need to laterally prop adjacent building foundations, highways and access lanes.

All design and detailing was completed in 3D to ensure all was as accurate as possible prior to site involvement.